Request for approval of a renewal option with Ceballos Construction, LLC (Primary); and Specialty Construction TX, LLC (Secondary) for concrete channel lining repairs (North) for the Flood Control District for the period of February 1, 2027 - January 31, 2028, at a cost of $3,353,813, and for the County Clerk to execute any applicable bonds to be received (250338), MWBE Contracted Goal: 19.11%, MWBE Current Participation: 17.17%. | Community Exchange
PolicyCountyOur Environment
Request for approval of a renewal option with Ceballos Construction, LLC (Primary); and Specialty Construction TX, LLC (Secondary) for concrete channel lining repairs (North) for the Flood Control District for the period of February 1, 2027 - January 31, 2028, at a cost of $3,353,813, and for the County Clerk to execute any applicable bonds to be received (250338), MWBE Contracted Goal: 19.11%, MWBE Current Participation: 17.17%.
Commissioners Court reviews a $3.35M contract renewal for concrete channel lining repairs in Harris County's northern Flood Control District.
Harris County Commissioners Court is reviewing a contract renewal with Ceballos Construction, LLC and Specialty Construction TX, LLC for concrete channel lining repairs in the northern Flood Control District. The contract would run from February 1, 2027 to January 31, 2028, at a cost of $3,353,813. The item was introduced on August 13, 2026.
Harris County pays contractors to repair concrete-lined flood channels in the northern part of the county. Residents near those channels may be affected if repairs are or are not completed.