Harris County Precinct 4's online Project Tracker lets residents follow road, drainage, sidewalk, and trail projects across the precinct. Covering areas from the Energy Corridor to Katy and serving more than 1.5 million people, the tracker shows which projects are in planning, design, or construction. Many projects are part of the Places 4 People program, which has funded 59 projects totaling more than $252 million since 2023. Visit cp4.harriscountytx.gov to see what is happening in your neighborhood.
• Shows the status of road, drainage, sidewalk, and trail projects across Precinct 4
• Tracks projects that are in planning, design, or construction phases
• Covers infrastructure investments under the Places 4 People program
• Serves residents across areas like the Energy Corridor, Katy, Alief, Sharpstown, and Westchase
1. Visit cp4.harriscountytx.gov/Infrastructure/Project-Tracker to access the tool
2. Look up projects by neighborhood or area to see what is planned or underway near you
3. Check the phase of each project — planning, design, or construction
• Operated by Harris County Precinct 4, a local government office
• Led by Commissioner Lesley Briones
• Places 4 People has funded 59 projects totaling more than $252 million since 2023
• Precinct 4 maintains more than 1,600 miles of roads
• Serves a population of more than 1.5 million residents
If you live in Harris County Precinct 4, this tool lets you see what road, drainage, sidewalk, or trail projects are planned or being built near you. It helps you stay informed about changes coming to your neighborhood.